    In association with AMCAT, Buckinghamshire Technology Limited was awarded the contract to supply and install a 40 Seat Inbound/Outbound Call Centre solution.

    Technologies Employed

    • AMCAT Predictive Dialler.
    • Structured Cabling
    • HP Proliant Database servers
    • HP Storageworks Ultrium 960 LTO3 Backup Solution
    • Dell Optiplex Desktops with 17" LCD Monitors
    • Sonic FireWall
    • Ethernet Switching
    • Symantec Antivirus
    Network Data Project Customer Logo
    Project Value
    £160,000.00
    Project Status
    Complete
    Referee
    Martin Wallace T.020 8420 4242
  • Tishman Speyer

    Buckinghamshire Technology Limited was awarded the contract to supply and install 600 Cat6 Structured cabling outlets and associated equipment including Data Cabinets. In addition we provided infrastructure and equipment for the building management suite.

    Technologies Employed

    • Hubbell premise cabling solution.
    • Prism FI-CAB4581 data cabinets
    • HP DL7700 Desktops
    • Ethernet Switching
    • ADSL Connectivty
    • Comms room equipment decom-recom
    Network Data Project Customer Logo
    Project Value
    £1.4 million
    Project Status
    Complete
    Referee
    Toby Cordery T.020 7333 4222
  • St Katherines Dock London

    Buckinghamshire Technology Limited was awarded the contract to supply and install 250 Cat6 Structured Cabling outlets along with a Fibre Optic interconnect solution.

    Technologies Employed

    • Excel premise cabling solution.
    • Fibre Optic Backbone
    • Comms Room design
    • Ethernet Switching
    Network Data Project Customer Logo
    Project Value
    £12k
    Project Status
    Complete
    Referee
    Mark Dixon DPNS Solutions Ltd T. 07956 961 111
  • Tishman Speyer

    Buckinghamshire Technology Limited was awarded the contract to supply and install 600 Cat6 Structured cabling outlets and associated equipment such as Data Cabinets and UPS technology. In addition we provided IT infrastructure and telephony equipment for the building management suite.

    Technologies Employed

    • Hubbell premise cabling solution.
    • Prism FI-CAB4581 data cabinets
    • HP DL7700 Desktops
    • APC UPS Technology
    • Ethernet Switching
    • ADSL Connectivity
    • Toshiba Telephone System
    • Comms room equipment decom-recom
    Network Data Project Customer Logo
    Project Value
    £60k
    Project Status
    Complete
    Referee
    Toby Cordery T.020 7333 4222
  • Wedgewood Museum

    Buckinghamshire Technology Limited recently undertook to provide, as Sub-Contract works to Farebrother Limited, part of the Mechanical and Electrical specification outlined as: - specification for telecommunications system, main fileserver and peripherals.

    Our scope was to cover the supply, installation and testing of the following equipment and associated services:-

    • The main telecommunications system for the museum
    • Incoming and Outgoing telephone and ADSL lines
    • Main fileserver and associated peripherals
    • Rack Cabinets to accommodate integrated telecommunications and data network components.

    As a more detailed description, following is a breakdown of the actual works and hardware provided.

    The telecommunications system comprised of a Toshiba CIX200 VoIP enabled telecommunications switch with capacity for 16 Digital Extensions and 16 IP extensions for use with Wireless IP phones. In addition we provided 5 Meru Wireless access points and a Meru Wireless access controller to allow for the roaming handsets. We provided 5 Hitachi wireless IP handsets and 10 Toshiba Classic 10 Key Display Feature phones. The system has voicemail and a variety of forwarding and conferencing facilities. The telephone system connects to the PSTN via an ISDN30 circuit with 8 channels.

    We provided Internet connectivity through our relationship with Power Net our ISP. The connection is a Cisco powered 4Mbit ADSL connection with fully monitored ISDN2e fail over, providing 24/7 uptime. This connects to a 3Com Switched Ethernet network providing Gigabit performance to the file and database servers.

    Compaq DL360 G5 servers running Windows SBS 2003 Server were implemented for both the fileserver and the database server running an N+1 raid environment with SAS powered HP Storage Works external SA60 Storage Area Network containing 2terabytes of storage media and capacity for another 6 terabytes there is plenty of information storage space.

    Backing all this up is a HP MSL2024 Ultrium 960 Tape Loader with capacity for 24 800gig LTO3 cartridges giving a total of almost 20 terabytes of backup space. Controlling all this is Symantec's Backup Exec AWS11d with advanced open file options.

    This solution is robust and pretty much bullet proof, it allows for plenty of expansion and will cater for the needs of the museum for the foreseeable future.

    Network Data Project Customer Logo
    Project Value
    £70k
    Project Status
    Complete
    Referee
    Gaye Blake-Roberts Wedgewood Museum Trust T. 01782 282 234

Contact Details

Buckinghamshire Technology ltd
9 Priors Park, Emerson Valley,
Milton Keynes, Buckinghamshire.
MK4 2BT

Quick Contact Form